  20.       
Meeting Date: 09/14/2010  
Submitted For: Krista Zaleski Submitted By: Krista Zaleski, Road Bond
Department: Road Bond  

Information
Agenda Item
Consider approving Change Order No. 11 in the amount of $54,792.33 for US 79 Section 5A, a Pass-Through project in Precinct 4.
Background
This change order is comprised of three separate items of work.

(1) Drainage ditches were being prematurely eroded due to excessive rainwater runoff from the adjacent plowed fields. Therefore, concrete riprap was needed to prevent erosion at high velocity locations in some ditches. In addition, rock riprap is needed near culvert headwalls to prevent erosion. This change order provides a pay item for the rock riprap.

(2) The overhead signs required by the plans for Phase 2 construction created a conflicting message. Therefore, an existing overhead sign being used during Phase 1 construction was relocated to present a clearer message. This change order provides payment to the contractor for this work.

(3) Seven drainage culverts that cross the roadway are not required to be completely replaced. Of these seven, three of the existing headwalls on the south side of the roadway were in need of repair, work which was not included in the PS&E. TxDOT requested repairs to these three headwalls. This change order provides payment to the contractor for this work.

Fiscal Impact
From/To Acct No. Description Amount
Attachments
US79Section5A-CO#11

<
Form Review
Inbox Reviewed By Date
County Judge Exec Asst. Wendy Coco 09/09/2010 02:07 PM
Form Started By: kzaleski Started On: 09/09/2010 11:53 AM
Final Approval Date: 09/09/2010

    