20.
Meeting Date:
05/07/2013
11WC915 SH 29 Two Way Left Turn Lane Change Order No 6
Submitted By:
Tiffany Mcconnell, Road Bond
Department:
Road Bond
Agenda Category:
Regular Agenda Items
Information
Agenda Item
Consider approving Change Order No. 6 in the amount of -$313.92 for SH 29 Two-Way Left Turn Lane, a Road Bond project in Precinct Two.
Background
This Change Order adds an asphalt overlay to six (6) driveways where the original design plans specified only a seal coat. The addition of an asphalt overlay on these driveways matches the roadway pavement surface course and other driveways on the project. This Change Order also documents overruns and underruns to various existing bid items due to actual field conditions, including various erosion control items were not needed (underrun) due to the drought conditions (rock filter dams, construction exits, backhoe hours, and temporary seeding) and additional guardrail installed due to a steep slope along the roadway.
Fiscal Impact
From/To
Acct No.
Description
Amount
Attachments
SH 29 TWLTL CO 6
<
Form Review
Inbox
Reviewed By
Date
County Judge Exec Asst.
Wendy Coco
05/02/2013 12:08 PM
Form Started By:
kzaleski
Started On:
05/02/2013 08:56 AM
Final Approval Date:
05/02/2013