24.
Meeting Date:
04/26/2011
Submitted By:
Tiffany Mcconnell, Road Bond
Department:
Road Bond
Information
Agenda Item
Consider approving Change Order No. 5 in the amount of $49,944.91 for CR 214 Phase 2A, a Road Bond Project in Precinct 2.
Background
This change order provides payment for additional work by the Contractor to undercut the proposed roadway and the area under the proposed Culvert A-2 boxes and utilize 18” to 24” rock placed roughly 2 to 3 ft deep to stabilize the unsuitable material.
Also included in this change order is payment to the Contractor for embankment material that was removed from the project due to a landfill that was encountered within the ROW. They also placed an18” clay liner, 12” of topsoil, and a soil retention blanket as the closure at the landfill. These items were installed according to TCEQ requirements.
This change order also provides payment to the Contractor to add riprap at the cemetery in lieu of topsoil, soil retention blankets & seeding to prevent erosion on the slope, for removal & replacement of an existing driveway that is in conflict with the proposed pavement, and for additional traffic control devices that were needed on the detour and along the edge of the pavement during the traffic switch.
Fiscal Impact
From/To
Acct No.
Description
Amount
Attachments
09WC723-CO#5
<
Form Review
Inbox
Reviewed By
Date
County Judge Exec Asst.
Wendy Coco
04/20/2011 03:48 PM
Form Started By:
kzaleski
Started On:
04/20/2011 11:48 AM
Final Approval Date:
04/20/2011
AgendaQuick ©2005 - 2021 Destiny Software Inc. All Rights Reserved.