26.
Meeting Date:
03/26/2013
12IFB00010 Ronald Reagan Blvd North Phase IV Change Order No 2
Submitted By:
Tiffany Mcconnell, Road Bond
Department:
Road Bond
Agenda Category:
Regular Agenda Items
Information
Agenda Item
Consider approving Change Order No. 2 in the amount of $80,283.40 for Ronald Reagan Blvd. North Phase IV, a Road Bond Project in Precinct Three.
Background
This Change Order adds driveways to the Yearwood property to restore access to the existing ranch road that was severed by the Reagan ROW acquisition that services the additional businesses on the property. Work items included are the asphalt driveway from the roadway to the right of way line, flex base to tie the driveway into the existing road, guardrail and cattleguards. The driveways are located as far from the quarry as possible and required the addition of guardrail to protect traffic from steep slopes and drop-offs. These driveways were not included by the design engineer in the original PS&E.
This Change Order also documents revisions to the steel encasement pipe sleeves being installed for the Chisholm Trail Special Utility District waterline and property owner sleeves. The Contractor requested to use a thinner wall steel encasement which was approved by CTSUD’s design engineer and is a credit to the project. Steel encasement crossings were added for the Irvine and Austin White Lime properties as part of the right-of-way acquisition requirements of the properties.
Fiscal Impact
From/To
Acct No.
Description
Amount
Attachments
RRN4 CO 2
<
Form Review
Inbox
Reviewed By
Date
County Judge Exec Asst.
Wendy Coco
03/21/2013 01:36 PM
Form Started By:
kzaleski
Started On:
03/21/2013 07:47 AM
Final Approval Date:
03/21/2013