27.
Meeting Date:
03/20/2012
SH 29 Intersection Improvements at Park Place and Jack Nicklaus Change Order No 1
Submitted By:
Tiffany Mcconnell, Road Bond
Department:
Road Bond
Agenda Category:
Regular Agenda Items
Information
Agenda Item
Consider approving Change Order No. 1 in the amount of ($3,673.43) for SH 29 Intersection Improvements at Park Place and Jack Nicklaus, a Road Bond Project in Precinct Three.
Background
This Change Order will add contract quantities for additional work by the Contractor to modify the grade of the ditch to create positive drainage from the outfall of the proposed Culverts 1 and 2 at Park Place to the existing SH 29 cross culvert east of Park Place. An accumulation of silt over the years has created a blockage in this drainage flowline. The work will include reshaping, adding topsoil, and reseeding the ditch from the proposed culverts outfall to the cross culvert so the proposed pipes at Park Place will not hold water.
This Change Order also reduces the Contract quantities of proposed 10-inch waterline and trench excavation. Once the existing waterline was exposed, a portion of the waterline was determined to have the required cover over it and did not require adjustment. CTSUD and their engineer reviewed the grades from the potholes and determined the length of the existing pipe that could remain in place.
This Change Order is a cost savings in the amount of ($3,673.43) and does not add or deduct any days to the Contract time.
Fiscal Impact
From/To
Acct No.
Description
Amount
Attachments
SH29ParkPlJackNicklaus-CO1
Change Order 1 for SH 29 Intersection Improvements
<
Form Review
Inbox
Reviewed By
Date
County Judge Exec Asst.
Peggy Vasquez
03/16/2012 01:38 PM
Form Started By:
kzaleski
Started On:
03/15/2012 07:13 AM
Final Approval Date:
03/16/2012
AgendaQuick ©2005 - 2021 Destiny Software Inc. All Rights Reserved.