09WC720 US 183 Change Order No 33
Submitted By:
Tiffany Mcconnell, Road Bond
Department:
Road Bond
Agenda Category:
Regular Agenda Items
Information
Agenda Item
Consider approving Change Order No. 33 in the amount of -$49,626.01 for US 183 a Pass Through Financing Project in Precinct Two.
Background
This Change Order compensates the Contractor for work associated with the redesign of Cross Culvert No. CC6. The original design of the culvert could not be used because an unknown existing 4x2 box culvert crossed under SH 29 where it would be in conflict with the bore for the new RCP drain pipe. Instead, the existing 4x2 box culvert will be incorporated into a new design to drain the area. Also included are the cost of restocking the 36 inch diameter pipe that was to be used for the bore under SH 29 and the costs associated with dewatering and filling back in the bore pit that had been dug to perform the bore.
Fiscal Impact
From/To
Acct No.
Description
Amount
Attachments
US 183 CO #33
<
Form Review
Inbox
Reviewed By
Date
County Judge Exec Asst.
Wendy Coco
10/06/2011 11:02 AM
Form Started By:
kzaleski
Started On:
10/06/2011 10:30 AM
Final Approval Date:
10/06/2011
AgendaQuick ©2005 - 2021 Destiny Software Inc. All Rights Reserved.