Print Minutes Return
             
01 MELBA KEMBLE COUNTY CLERK
  MELBA KEMBLE SWORN AS COUNTY CLERK DUE TO THE DROWNING DEATH OF ELAINE BIZZELL. BOND FOR MELBA ACCEPTED.  
 
  Attachments:
  CCT90_001.PDF
 
             
02 MELBA KEMBLE BOND CO CLERK
  MELBA KEMBLE BOND FOR COUNTY CLERK  
 
  Attachments:
  CCT90_002.PDF
 
             
03 COUNTY CLERK HIRE EMPLOYEES
  NEW COUNTY CLERK HIRE EMPLOYEES  
 
  Attachments:
  CCT90_003.PDF
 
             
04 EMPLOYEES FOR COUNTY CLERK
  HIRE EMPLOYEES TO WORK UNDER NEW COUNTY CLERK MELBA KEMBLE  
 
             
05 APRIL 14, 1998 AGENDA
  AGENDA APRIL 14, 1998 REGULAR SESSION COMMISSIONERS COURT MEETING  
 
  Attachments:
  CCT90_005.PDF
 
             
06 DB WOOD BRIDGE CONSTRUCTION
  DON BIZZELL BROKEN WATER LINE DB WOOD BRIDGE CONSTRUCTION SITE  
 
  Attachments:
  CCT90_006.PDF
 
             
07 D B WOOD ROAD BRIDGE
  D.B.WOOD ROAD BRIDGE CONSTRUCTION SITE BROKEN WATER LINE  
 
  Attachments:
  CCT90_007.PDF
 
             
08 DA KEN ANDERSON JAIL STUDY
  DISTRICT ATTORNEY KEN ANDERSON JAIL STUDY IN 2 WEEKS INSTEAD OF CITIZENS INSTEAD OF $92,800. CITIZENS CRIMINAL JUSTICE COMMITTEE STUDY  
 
  Attachments:
  CCT90_008.PDF
 
             
09 DA KEN ANDERSON JAIL STUDY
  DA KEN ANDERSON JAIL STUDY IN 2 WEEKS INSTEAD OF CITIZENS CRIMINAL JUSTICE COMMITTEE $92,700.00 STUDY CONTRACT WHICH HAS NOT BEEN SIGNED BY JUDGE DOERFLER  
 
  Attachments:
  CCT90_009.PDF
 
             
10 DON T. HUTTO TAYLOR FACILITY
  T. DON HUTTO TAYLOR FACILITY EXCESS BED CAPACITY  
 
  Attachments:
  CCT90_010.PDF
 
             
11 RFP'S BARTLETT JAIL
  TEXAS DEPT CRIMINAL JUSTICE AWARD RFP'S IN MAY, 1998  
 
  Attachments:
  CCT90_011.PDF
 
             
12 APRIL 7, 1998 MINUTES APPROVED
  APRIL 7, 1998 MINUTES APPROVED  
 
  Attachments:
  CCT90_012.PDF
 
             
13 APPROVE PAYMENT OF BILLS $1,729,459.80
   
 
  Attachments:
  CCT90_013.PDF
 
             
14 BERNIE DOWNING OFF ROW
  BERNIE DOWNING, MELVIN POLDRACK, JOHNSON FARMS & EDWIN ALMQUIST OFF ROW FOR BOX CULVERT  
 
  Attachments:
  CCT90_014.PDF
 
             
15 GENERAL TELEPHONE ROW CR 152 &327
  GENERAL TELEPHONE ROW CR 152 & 327  
 
  Attachments:
  CCT90_015.PDF
 
             
16 SWB REPAIR 12715 COPPER CK DR
  SWB BORE PIT REPAIR 12715 COPPER CREEK DR IN FOREST NORTH SUBDIVISION  
 
  Attachments:
  CCT90_016.PDF
 
             
17 LOT 1 BLK P DURHAM PARK, 3 PH RE-SUB
  PH RE-SUB LOT 1 BLOCK P, DURHAM PARK, SECTION 3 ON 5-12-98  
 
  Attachments:
  CCT90_017.PDF
 
             
18 DURHAM PARK PH RESUB 1P, SEC 3 5-12-98
  DURHAM PARK PH RESUB LOT 1 BLK P, SECTION 3 ON MAY 12, 1998  
 
  Attachments:
  CCT90_018.PDF
 
             
19 QUARTER ACRES SUBD PRELIM PLAT
  QUARTER ACRES SUBDIVISION PRELIMINARY PLAT APPROVED  
 
  Attachments:
  CCT90_019.PDF
 
             
20 VISTA OAKS SEC 2A PH 2
  TO ACCEPT VISTA OAKS, SECTION 2A, PHASE 2 FOR COUNTY ROAD MAINTENANCE.  
 
  Attachments:
  CCT90_020.PDF
 
             
21 VISTA OAKS SEC 2A PH 2 CO ROAD MAINTENANCE
  VISTA OAKS, SECTION 2A, PHASE 2 FOR COUNTY ROAD MAINTENANCE  
 
  Attachments:
  CCT90_021.PDF
 
             
22 BRUSHY BEND PARK, SEC II, PH II
  REPLAT OF LOTS 4 & 5 BRUSHY BEND PARK, SECTION II, PHASE II, FINAL PLAT APPROVED  
 
  Attachments:
  CCT90_022.PDF
 
             
23 VISTA OAKS 2B COUNTY ROAD MAINTENANCE
  VISTA OAKS PHASE 2B ACCEPTED FOR COUNTY ROAD MAINTENANCE  
 
  Attachments:
  CCT90_023.PDF
 
             
24 VISTA OAKS 2B COUNTY ROAD MAINTENANCE
  VISTA OAKS PHASE 2B ACCEPTED FOR COUNTY ROAD MAINTENANCE  
 
  Attachments:
  CCT90_024.PDF
 
             
25 TRADESMEN'S INDUSTRIAL PARK 2
  TRADESMEN'S INDUSTRIAL PARK, SECTION 2 FINAL PLAT APPROVED  
 
  Attachments:
  CCT90_025.PDF
 
             
26 PH HIDDEN MEADOW DR SIGNAGE
  PH HIDDEN MEADOW DRIVE REGULATORY SIGNAGE  
 
  Attachments:
  CCT90_026.PDF
 
             
27 HIDDEN MEADOW DRIVE TOW ZONE
  HIDDEN MEADOW DRIVE APPROVE TOW-AWAY ZONE 9-4 MONDAY THRU FRIDAY 2 SIGNS POSTED AND CURB PAINTED RED  
 
  Attachments:
  CCT90_027.PDF
 
             
28 FAIR HOUSING MONTH
  PROCLAIM APRIL AS FAIR HOUSING MONTH IN WILLIAMSON COUNTY  
 
  Attachments:
  CCT90_028.PDF
 
             
29 KENNETH CHRANE VARIANCE NO ACT
  NO ACTION VARIANCE TO KENNETH CHRANE 71 ACRE TRACT  
 
  Attachments:
  CCT90_029.PDF
 
             
30 ATS FY 1998-2000 RESOLUTION
  APPROVE RESOLUTION SUPPORTING AMENDMENT TO ATS FY 1998-2000 TRANSPORTAION IMPROVEMENT PROGRAM PERTAINING TO LEFT TURN LANE OF FM 1431 FROM US 183 TO FM 734  
 
  Attachments:
  CCT90_030.PDF
 
             
31 FM 1431 LEFT TURN LANE
  APPROVE RESOLUTION SUPPORTING AN AMENDMENT TO THE ATS FY 1998-2000 TRANSPORTATION IMPROVEMENT PROGRAM PERTAINING TO THE LEFT TURN LANE OF FM 1431 FROM US 183 TO FM 734  
 
  Attachments:
  CCT90_031.PDF
 
             
32 STOREAGE AREA JUSTICE CENTER BIDS
  BIDS STORAGE AREA JUSTICE CENTER AWARDED TO RICHMOND COMMERCIAL CONSTRUCTION, INC.  
 
  Attachments:
  CCT90_032.PDF
 
             
33 STOREAGE AREA JUSTICE CENTER BIDS
  BIDS STORAGE AREA JUSTICE CENTER AWARDED TO RICHMOND COMMERCIAL CONSTRUCTION, INC.  
 
  Attachments:
  CCT90_033.PDF
 
             
34 KURKJAN ENGINEERING MORRIS RD
  KURKJAN ENGINEERING AWARDED CONTRACT FOR ENGINEERING SERVICES FOR MORRIS ROAD IMPROVEMENTS  
 
  Attachments:
  CCT90_034.PDF
 
             
35 KURKJAN ENGINEERING MORRIS RD
  KURKJAN ENGINEERING AWARDED CONRACT MORRIS ROAD ENGINEERING SERVICES  
 
  Attachments:
  CCT90_035.PDF
 
             
36 CARTS SERVICES PRESENTATION
  DAVE MARSH & EDNA BURROUGHS PRESENTED CARTS SERVICES TO COURT  
 
  Attachments:
  CCT90_036.PDF
 
             
37 COUPLAND STREET CLOSINGS
  COUPLAND MOVIE FILMING APRIL 16-25 STREET CLOSINGS APPROVED  
 
  Attachments:
  CCT90_037.PDF
 
             
38 COUPLAND STREET CLOSINGS
  COUPLAND MOVIE FILMING APRIL 16-25 STREET CLOSINGS APPROVED  
 
  Attachments:
  CCT90_038.PDF
 
             
39 MOVIE FILMING POLICY
  HEAR UPDATE FROM COUNTY ATTORNEY ON MOVIE FILMING POLICY  
 
  Attachments:
  CCT90_039.PDF
 
             
40 MOVIE FILMING POLICY
  HEAR UPDATE FROM COUNTY ATTORNEY ON MOVIE FILMING POLICY  
 
  Attachments:
  CCT90_040.PDF
 
             
41 BONDS HEALTH FACILITY
  APPROVE RESOLUTION CONCERNING THE USE OF PROCEEDS OF REVENUE BONDS ISSUED BY TARRANT CO. HEALTH FACILITIES TO REFINANCE WM. CO HEALTH FACILITY  
 
  Attachments:
  CCT90_041.PDF
 
             
42 AUDITOR FINANCIAL AUDIT REPORT
  COUNTY AUDITOR CAFR (COMBINED AUDIT FINANCIAL REPORT) PRESENTATION  
 
  Attachments:
  CCT90_042.PDF
 
             
43 TAYLOR ANNEX BIDS 6-9-98
  RECEIVE TAYLOR ANNEX BIDS 6-9-98 WITH MANDATORY PRE-BID CONFERENCE 5-26-98  
 
  Attachments:
  CCT90_043.PDF
 
             
44 TAYLOR ANNEX BIDS 6-9-98
  RECEIVE TAYLOR ANNEX BIDS 6-9-98 WITH MANDATORY PRE-BID CONFERENCE 5-26-98  
 
  Attachments:
  CCT90_044.PDF
 
             
45 CONTRACT MOWING BIDS 4-14-98
  TO ADVERTISE 10 A.M. 5-5-98 TO OPEN BIDS FOR COTRACT MOWING  
 
  Attachments:
  CCT90_045.PDF
 
             
46 CONTRACT MOWING BIDS 4-14-98
  TO ADVERTISE 10 A.M. 5-5-98 TO OPEN BIDS FOR COTRACT MOWING  
 
  Attachments:
  CCT90_046.PDF
 
             
47 CONTRACT SEAL COATING BIDS 5-5-98
  AUTHORIZE ADVERTISING 10:15 A.M. MAY 5, 1998 TO OPEN CONTRACT SEAL COATING BIDS  
 
  Attachments:
  CCT90_047.PDF
 
             
48 CONTRACT SEAL COATING BIDS 5-5-98
  AUTHORIZE ADVERTISING 10:15 A.M. MAY 5, 1998 TO OPEN CONTRACT SEAL COATING BIDS  
 
  Attachments:
  CCT90_048.PDF
 
             
49 PH RESUB LOT 27-1 WHITETAIL II
  PH VARIANCE & PARTIAL RE-SUBDIVISION LOT 27-A WHITETAIL II 5-12-98 10:15 A.M.  
 
  Attachments:
  CCT90_049.PDF
 
             
50 PH RESUB LOT 27-1 WHITETAIL II
  PH VARIANCE & PARTIAL RE-SUBDIVISION LOT 27-A WHITETAIL II 5-12-98 10:15 A.M.  
 
  Attachments:
  CCT90_050.PDF
 
             
51 PH RESUB LOT 27-1 WHITETAIL II
  PH VARIANCE & PARTIAL RE-SUBDIVISION LOT 27-A WHITETAIL II 5-12-98 10:15 A.M.  
 
  Attachments:
  CCT90_051.PDF
 
             
52 TECHNOLOGY DECISION, INC. AWARDED TELEPHONE AUDIT
  TO AWARD TELEPHONE AUDIT TO TECHNOLOGY DECISIONS, INC.  
 
  Attachments:
  CCT90_052.PDF
 
             
53 ANDERSON MILL ROAD APPRAISAL SERVICES
  TO NOTE AUTHORIZATION FOR PCT 1 TO UTILIZE 1 OR ALL 3 AEGIS GROUP, INC., AUSTIN EVALUATION CONSULTINGS, INC. 7 KOKEL & ASSOC. PROFESSIONAL APPRAISAL SERVICES FOR ANDERSON MILL ROAD  
 
  Attachments:
  CCT90_053.PDF
 
             
54 ANDERSON MILL ROAD APPRAISAL SERVICES
  TO NOTE AUTHORIZATION FOR PCT 1 TO UTILIZE 1 OR ALL 3 AEGIS GROUP, INC., AUSTIN EVALUATION CONSULTINGS, INC. 7 KOKEL & ASSOC. PROFESSIONAL APPRAISAL SERVICES FOR ANDERSON MILL ROAD  
 
  Attachments:
  CCT90_054.PDF
 
             
55 TRANSPORTATION STUDY PAYMENT
  PAYMENT FOR TRANSPORTATION STUDY WAS DISCUSSED BUT NO ACTION WAS TAKEN ON THIS AGENDA ITEM  
 
  Attachments:
  CCT90_055.PDF
 
             
56 EMS & TRAUMA CARE FUNDS
  TO APPROVE CONTRACT WITH TEXAS DEPT HEALTH FOR EMS & TRAUMA CARE FUNDS FOR EXTRAORDINARY EMERGENCIES  
 
  Attachments:
  CCT90_056.PDF
 
             
57 EMS & TRAUMA CARE FUNDS
  TO APPROVE CONTRACT WITH TEXAS DEPT HEALTH FOR EMS & TRAUMA CARE FUNDS FOR EXTRAORDINARY EMERGENCIES  
 
  Attachments:
  CCT90_057.PDF
 
             
58 EMS & TRAUMA CARE FUNDS
  TO APPROVE CONTRACT WITH TEXAS DEPT HEALTH FOR EMS & TRAUMA CARE FUNDS FOR EXTRAORDINARY EMERGENCIES  
 
  Attachments:
  CCT90_058.PDF
 
             
59 PAUL EDGAR $203.93 DAMAGES
  APPROVE PAYMENT $203.93 CLAIM FROM PAUL EDGAR FOR DAMAGES TO VEHICLE BY UNIFIED ROAD SYSTEM WORKERS.  
 
  Attachments:
  CCT90_059.PDF
 
             
60 PAUL EDGAR $203.93 DAMAGES
  APPROVE PAYMENT $203.93 CLAIM FROM PAUL EDGAR FOR DAMAGES TO VEHICLE BY UNIFIED ROAD SYSTEM WORKERS.  
 
  Attachments:
  CCT90_060.PDF
 
             
61 PAUL EDGAR $203.93 DAMAGES
  APPROVE PAYMENT $203.93 CLAIM FROM PAUL EDGAR FOR DAMAGES TO VEHICLE BY UNIFIED ROAD SYSTEM WORKERS.  
 
  Attachments:
  CCT90_061.PDF
 
             
62 RAYLEEN REICH $677.33 DAMAGES
  TO APPROVE $677.33 PAYMENT FOR RAYLEEN REICH FOR DAMAGES TO VEHICLE BY UNIFIED ROAD SYSTEM WORKERS  
 
  Attachments:
  CCT90_062.PDF
 
             
63 RAYLEEN REICH $677.33 DAMAGES
  TO APPROVE $677.33 PAYMENT FOR RAYLEEN REICH FOR DAMAGES TO VEHICLE BY UNIFIED ROAD SYSTEM WORKERS  
 
  Attachments:
  CCT90_063.PDF
 
             
64 RAYLEEN REICH $677.33 DAMAGES
  TO APPROVE $677.33 PAYMENT FOR RAYLEEN REICH FOR DAMAGES TO VEHICLE BY UNIFIED ROAD SYSTEM WORKERS  
 
  Attachments:
  CCT90_064.PDF
 
             
65 SEXUALLY ORIENTED BUSINESS ORDINANCE
  NO ACTION ON AMENDING PRESENT POLICY FOR SEXUALLY ORIENTED BUSINESS ORDINANCE  
 
  Attachments:
  CCT90_065.PDF
 
             
66 EMS LINE ITEM TRANSFER
  EMS LINE ITEM TRANSER  
 
  Attachments:
  CCT90_066.PDF
 
             
67 UNIFIED ROAD & BRIDGE LIT
  UNIFIED ROAD & BRIDGE LIT  
 
  Attachments:
  CCT90_067.PDF
 
             
68 DISTRICT ATTY BUDGET AMENDMENT
  TO DECLARE AN EMERGENCY & APPROVE A BUDGET AMENDMENT TO ACKNOWLEDGE ADDITIONAL REVENUE FROM THE DISTRICT ATTORNEY HOT CHECK FUND TO GENERAL FUND  
 
  Attachments:
  CCT90_068.PDF
 
             
69 DA ADDITIONAL EXPENDITURES
  TO DECLARE AN EMERGENCY & APPROVE A BUDGET AMENDMENT TO ACKNOWLEDGE ADDITIONAL EXPENDITURES FOR DISTRICT ATTORNEY  
 
  Attachments:
  CCT90_069.PDF
 
             
74 COMM. BOATRIGHT TXDOT FUNDING
  COMM BOATRIGHT TXDOT FUNDING DUE TO $2,750,000.00 CONTRIBUTION CITY OF ROUND ROCK FOR FRONTAGE ROAD TURN AROUND AT FM 1325 & IH 35  
 
  Attachments:
  CCT90_074.PDF
 
             
75 APPROVE MINUTES LAST ROAD DISTRICT MEETING
  APPROVE MINUTES OF THE LAST MEETING  
 
  Attachments:
  CCT90_075.PDF
 
             
76 SERD PAYMENT OF BILLS
  APPROVE PAYMENT OF $532.45 TO BROWN MCCARROLL SHEETS & CROSSFIELD, L.L.P.  
 
  Attachments:
  CCT90_076.PDF
 
             
77 SERD PAYMENT OF BILLS
  TO APPROVE $672.00 REIMBURSEMENT TO PRECINCT #2 FOR PAYMENT OF ONE THIRD OF $2,016.00 ROAD DISTRICT COMPUTER PURCHASED FROM GATEWAY 2000.  
 
  Attachments:
  CCT90_077.PDF
 
             
79 SWRD PAYMENT OF BILLS
  SWRD TO APPROVE $672.00 REIMBURSEMENT TO PRECINCT #2 FOR PAYMENT OF ONE THIRD OF $2,016.00 ROAD DISTRICT COMPUTER PURCHASED FROM GATEWAY 2000.  
 
             
80 MOVIE FILMING POLICY
  HEAR UPDATE FROM COUNTY ATTORNEY ON MOVIE FILMING POLICY  
 
  Attachments:
  CCT90_080.PDF
 
             
81 NERD PAYMENT OF BILLS
   
 
  Attachments:
  CCT90_081.PDF
 

    

Level double AA conformance,